6.2 Preparing for operation
6 Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
6-2
6.2Preparing for operation6200Preparing for operation6-
6.2.1 Download modified project to the PNOZmulti safety system
Download modified project to the PNOZmulti safety system6-Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA
As soon as an additional expansion module has been connected to the
system, the project must be amended using the PNOZmulti Configura-
tor. Proceed as described in the operating instructions for the base unit.
6.2.2 Connection
Connection6-Schnittstellenbelegung_ 8-polig_mml1p
Betriebsbereitschaft herstellen Ans chluss PNOZ mml1p
Supply voltage
NOTICE
For the commissioning and after every program change, you
must check whether the safety devices are functioning correctly.
RJ45 socket
8-pin
PIN Layout
1CA+
2CA-
3CB+
4n.c.
5n.c.
6CB-
7n.c.
8n.c.
Shield CGround
Supply voltage AC DC