
Installation
Operating Manual PNOZ m1p (ETH)
20878-EN-12
15
Dimensions
Install base unit without expansion module
} The terminator must be fitted to the side of the base unit marked “Termination/Link”.
} Do not fit a terminator on the left hand side of the base unit.
Connecting the base unit and expansion modules
The modules are linked via jumpers.
There are 2 pin connectors on the rear of the base unit.
A max. of 12 expansion modules plus one fieldbus module may be connected to one base
unit.
} Ensure that no terminator is connected.
} Connect the base unit, the expansion modules and the fieldbus module using the jump-
ers supplied.
} The terminator must be fitted to the last expansion module to the right of the base unit.
} A terminator must not be fitted to the last expansion module to the left of the base unit.
5.2
5.3
5.4
Comentários a estes Manuais