
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
5-1
5.1 General installation guidelines
5 Installation
55000InstallationInstallation5-5.1General installation guidelines5100General installation guidelines5-][Montage BA Kopfmodul Allgemein
Please also refer to the PSSuniversal Installation Manual.
The description below assumes that the mounting rail is already in-
stalled.
Montage_EMV ESD
5.1.1 Dimensions
Dimensions5-][Abmessungen SB p und ST-Bus
CAUTION!
Damage due to electrostatic discharge!
Electrostatic discharge can damage components. Ensure
against discharge before touching the product, e.g. by touching
an earthed, conductive surface or by wearing an earthed arm-
band.
56,4 mm
125,6 mm
72,6 mm
75,2 mm
69,2 mm
2,8 mm
21,6 mm
(2.448")(2.22")
(0.11")
(4.945")
(2.858")
(0.85")
(2.96")
Comentários a estes Manuais