Pilz PSENvip RL D P Manual do Utilizador Página 94

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 139
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 93
7.2 Initial commissioning
7 Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
7-12
Fig. 7-11: Adjustment template to attach to bracket
1: Ø 3 mm DIN 1472 half length taper-grooved dowel pin
2: M3 x 10 cylinder head bolts
3: Ø 3 mm DIN 1472 half length taper-grooved dowel pin
Attach the bracket to the upper tool clamp.
Fig. 7-12: Adjustment template with bracket
1: Bracket
INFORMATION
To align the transmitter and receiver, follow the same procedure
as outlined in the section entitled "Align transmitter and
receiver".
10
45
65
Ø 3
+0,1
Ø 3,4
Ø 3,4
Ø 3
+0,1
1
3
2
1
Vista de página 93
1 2 ... 89 90 91 92 93 94 95 96 97 98 99 ... 138 139

Comentários a estes Manuais

Sem comentários