Pilz PSEN enc s2 eCAM Manual do Utilizador Página 79

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 93
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 78
Installation / Preparation for commissioning
30
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Deutschland
Telefon +49 711 3409-0, Telefax +49 711 3409-133, E-Mail: [email protected]
English
5.6 Shield connection
The shield connection is made via special EMC-compliant cable screw connections, in
which the cable shield can be connected internally.
Cable screw connection assembly, type A
Pos. 1 Union nut
Pos. 2 Sealing insert
Pos. 3 Contact sleeve
Pos. 5 Screw socket
1. Trim the shield braid / shield foil to the dimension "X".
2. Slide the union nut (1) and sealing insert / contact sleeve (2) + (3) over the
cable.
3. Bend the shield braid / shield foil by approx. 90° (4).
4. Slide the sealing insert / contact sleeve (2) + (3) up to the shield braid / shield
foil.
5. Fit the screw socket (5) on the housing.
6. Push the sealing insert / contact sleeve (2) + (3) flush into the screw socket
(5).
7. Screw the union nut (1) to the screw socket (5).
Vista de página 78
1 2 ... 74 75 76 77 78 79 80 81 82 83 84 ... 92 93

Comentários a estes Manuais

Sem comentários