7.6 Check protective equipment
7 Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
7-28
7.6.1.5 Function test using the test piece
Function test using the test piece7-Inbetriebnahme_Schutzeinrichtung_pruefen_Funjktionspruefung_mit_Pruefkoerper
Function test using the test rod (= test piece handle)
Move the test rod (14 mm diameter) slowly along the whole detection
zone at the centre point of the upper tool.
Fig. 7-22: Function test using test rod
The test rod must be detected along the whole length of the detection
zone.
The OSSDs switch to the OFF state. The LED on the receiver lights up
red.
INFORMATION
The following tests must be run on the left- and right-hand end
as well as in the centre of the press brake:
- During initial commissioning: 10 times
- During the daily check and during a tool change: 3 times