
7.2 Initial commissioning
7 Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
7-4
7.2.1.3 Adjustment directions of transmitter and receiver
Adjustment directions of transmitter and receiver7-Inbetriebnahme_Erstinbetriebnahme_Verstellrichtungen
The PSENvip transmitter and receiver can be adjusted in three direc-
tions.
Fig. 7-2: Adjustment directions of transmitter and receiver
Direction What?
A Move horizontally within the groove of the adjustment plate
B Rotate on a horizontal plane within the slot holes of the ad-
justment plate
C Move vertically by adjusting the nuts on the bolts
Comentários a estes Manuais