7.1 Commissioning guidelines
7 Commissioning
77000CommissioningCommissioning7-7.1Commissioning guidelines7100Commissioning guidelines7-Inbetriebnahme_Hinweise
When commissioning for the first time, please note the following:
Initial commissioning involves
Aligning the transmitter and receiver
Tracking the adjustment line to the tip of the upper tool
Entering the overrun
Performing the function test using the test piece
The tool change adjustment involves
Tracking the adjustment line to the tip of the upper tool
Performing the function test using the test piece
CAUTION!
Have the protective equipment tested and approved before
commissioning for the first time!
Any machine safeguarded by the PSENvip must be tested and
approved by qualified personnel before it is placed on the mar-
ket. A test report must be generated and archived during initial
commissioning.
Please refer to the guidelines given in the chapter entitled
"Safety", under "Qualified Personnel".
NOTICE
The tool change adjustment must also be made during initial
commissioning.